Immediate at 1 Feb2018 Many thanks for the constructive discussion at LCVG in regard to the issues identified with the operation of Twechar and Bonnybridge lift bridges. As discussed, with the technical problems that we have identified, we have no option but to temporarily close these bridges until funding can be identified to facilitate either […]
You are browsing archives for
Category: Front Page News
General News Items
Tide Tables for Leith 2018
The tide tables for Leith are now on the website and can be found on the right hand side of most pages.
Yacht Championship 2017 Results
The results have been collated and can be viewed here YC 2017 Final. For rules and conditions please refer to the Yacht Championship page.
FIG Series 2017 Results
The FIG series results have now been collated and can be accessed here – FIG2017. For rules and conditions please refer to the FIG Conditions page.
Stirling Town Quay Repairs Completed
Repairs to the collapse at Stirling Town Quay have been finished. A 25m bowed wall of gabion baskets topped by concrete blocks and a steel railing fence has been constructed. The wall is rough with stones protruding from the baskets. There are under water obstacles at each end of the new wall visible at lower […]
ECSF 2017
All the results from East Coast Sailing Festival 2017 are now available on the Qualifying Regattas page.
ECSF 2017 SIs Now Available
ECSF 2017 Sailing Instructions are now available on the Qualifying Regattas Page. The are also available here: ECSF 2017 SI’s.
URBAN UNION ECSF Festival Muster
Cramond Boat Club Dinghy Regatta
Notice and Sailing Instructions are attached for the Cramond Boat Club dinghy regatta on 19th and 20th August. Please note that there will be a single open handicap class including a cadet class. Entries from visitors will be very welcome. If you intend to take part, please let me know at alvinbarber7@gmail.com Notice of Race […]
Forth and Clyde Canal Update
Information from Scottish Canals The repairs to Lock 9 Cill were completed last Friday, a 48 hour “curing Time” for the concrete means that the canal will open for business on Monday 24th July.